Department of Civil Engineering, The University of Hong Kong, Pokfulam Road, Hong Kong
Employment information
Institution
The University of Hong Kong
Department
Department of Civil Engineering
Administrative Post (if any)
Associate Dean, Faculty of Engineering
Personal Webpage
http://web.hku.hk/~hrecatk/
Application Project
Project Name in English
Retrofitting strategy of bridges in regions of low to moderate seismicity taking into account life-cycle cost and benefit considerations
Project Name in Chinese
于中低地震烈度地区及考虑寿命周期成本与效益的桥梁加固策略
Brief description of the Project
---
Academic Discipline of the Research Project
Civil Engineering
Academic Discipline (specifically) in Chinese
0814 土木工程
Is this an inter-disciplinary project ?
---
Discipline 1)
---
Academic Discipline (specifically) in Chinese
---
Discipline 2)
---
Academic Discipline (specifically) in Chinese
---
Special Requirement for the Postdoctoral Fellow Candidates(if any)
The postdoctoral fellow candidate should preferably have experience in bridge engineering and numerical modelling.
Academic Qualifications
BSc(Eng), MSc(Eng), PhD
Professional Accomplishments, Honors, Awards and Patents
- FIStructE, MICE, FHKIE, CEng, RPE (Civil, Structural)
- HKIE Transactions Prize 2002 (Civil) (listed with L.G. Tham and M. Tong)
- 第三届欧维姆优秀预应力论文奖一等奖(中国土木工程学会北京詹天佑土木工程科学技术发展基金会欧维姆预应力技术发展专项基金; 2009; 杜进生,区达光,张佑启,关国雄,无粘结预应力混凝土梁的延性分析)
- 第四届欧维姆优秀预应力论文奖二等奖(中国土木工程学会北京詹天佑土木工程科学技术发展基金会欧维姆预应力技术发展专项基金; 2012; 杜进生,区达光,体外FRP筋的极限应力分析)
- Structural Excellence Award 2016 - R&D Award: Commendation Merit of Joint Structural Division of HKIE and IStructE for the paper “Francis T.K. Au, Cliff C.Y. Leung and Albert K.H. Kwan, Collapse mechanism and robustness of precast segmental bridges, Proceedings of the ICE – Bridge Engineering, Volume 167, Issue BE4, December 2014”
Are you a member of the Society of Hong Kong Scholars?
* Performance-based design of post-tensioned high-strength concrete flat slabs under fire (HKU 710012), Hong Kong Research Grants Council, $500,000 (excluding 15% on-cost), 1 January 2013 – 31 December 2015
* Practical guidelines for seismic design and rating of bridges in Hong Kong, Hong Kong Construction Industry Council, $1,347,729 (including 15% on-cost), 1 August 2016 – 31 July 2019